Factory Price For Mud Pump 3 Hp - SHD200 horizontal directional drilling rig – Sinovo Detail:
Main Technical Parameter
Model |
Unit |
SHD200 |
Engine |
|
CUMMINS |
Rated power |
KW |
250*2 |
Max.pullback |
KN |
2380 |
Max. thrusting |
KN |
2380 |
Spindle torque(max) |
N.m |
74600 |
Spindle speed |
r/min |
0-90 |
Backreaming diameter |
mm |
1800 |
Tubing length (single) |
m |
9.6 |
Tubing diameter |
mm |
127 |
Entry angle |
° |
8-20 |
Mud pressure (max) |
bar |
150 |
Mud flow rate (max) |
L/min |
1500 |
Dimension (L* W* H) |
m |
17*3.1*2.9 |
Overall weight |
t |
41 |
Performance And Characteristic
Pluralities of advanced control technologies are adopted, including the PLC control, electro-hydraulic proportion control, load sensitive control, etc.
The drilling rod automatic disassemble and assembly device can improve the working efficiency, relieves the labor intensity and manual error operation of the operators, and reduces the construction personnel and the construction cost.
Automatic anchor: the down and the up of the anchor is driven by hydraulics. The anchor is great in force and is easy and convenient to operate.
The dual-speed power head is operated with low speed when drilling and dragging back to ensure smooth construction, and can speed up to slide with 2 times of speed to reduce the auxiliary time and improve the working efficiency when returning and disassembling the drilling rod with empty loads.
The engine has the turbine torque increment characteristic, which can instantly increase the power to ensure the drilling power when coming across the complex geology.
The power head has high rotation speed, good boring effect and high construction efficiency.
Single-lever operation: it is convenient to precisely control and is easy and comfortable to operate in performing various functions such as thrust/pullback and rotary, etc.
The rope controller can carry out the disassembly and assembly vehicle operation with single person, with safe and high efficiency.
The engine, hydraulic parameter monitoring alarm and a plurality of safety protection are provided to effectively protect the safety of the operators and the machines.
Packaging & Delivery
Packaging Details
Standard exported box
Port
Tianjin
Lead Time :
Quantity(Sets) |
1 – 5 |
>5 |
Est. Time(days) |
5 |
To be negotiated |
Product detail pictures:
Related Product Guide:
"Sincerity, Innovation, Rigorousness, and Efficiency" would be the persistent conception of our enterprise with the long-term to build with each other with consumers for mutual reciprocity and mutual advantage for Factory Price For Mud Pump 3 Hp - SHD200 horizontal directional drilling rig – Sinovo, The product will supply to all over the world, such as: Ghana, Greek, Israel, Profession, Devoting are always fundamental to our mission. We've got always been in line with serving customers, creating value management objectives and adhering to the sincerity, dedication, persistent management idea.
By Hannah from Argentina - 2018.06.09 12:42
We are long-term partners, there is no disappointment every time, we hope to maintain this friendship later!
By EliecerJimenez from Japan - 2017.09.30 16:36