OEM Customized Precast Reinforced Concrete Piles - Casing Rotator – Sinovo Detail:
Technical Parameters
TR1305H | |||
Working device |
Diameter of drill hole |
mm |
Φ600-Φ1300 |
Rotary torque |
KN.m |
1400/825/466 Instantaneous 1583 |
|
Rotary speed |
rpm |
1.6/2.7/4.8 |
|
Lower pressure of sleeve |
KN |
Max.540 |
|
Pulling force of sleeve |
KN |
2440 Instantaneous 2690 |
|
Pressure-pulling stroke |
mm |
500 |
|
Weight |
ton |
25 |
|
Hydraulic power station |
Engine model |
|
Cummins QSB6.7-C260 |
Engine Power |
Kw/rpm |
201/2000 |
|
Fuel consumption of engine |
g/kwh |
222 |
|
Weight |
ton |
8 |
|
Control mode |
|
Wired remote control/ Wireless remote control |
TR1605H | ||
Diameter of drill hole |
mm |
Φ800-Φ1600 |
Rotary torque |
KN.m |
1525/906/512 Instantaneous 1744 |
Rotary speed |
rpm |
1.3/2.2/3.9 |
Lower pressure of sleeve |
KN |
Max.560 |
Pulling force of sleeve |
KN |
2440 Instantaneous 2690 |
Pressure-pulling stroke |
mm |
500 |
Weight |
ton |
28 |
Engine model |
|
Cummins QSB6.7-C260 |
Engine Power |
Kw/rpm |
201/2000 |
Fuel consumption of engine |
g/kwh |
222 |
Weight |
ton |
8 |
Control mode |
|
Wired remote control/ Wireless remote control |
TR1805H | ||
Diameter of drill hole |
mm |
Φ1000-Φ1800 |
Rotary torque |
KN.m |
2651/1567/885 Instantaneous 3005 |
Rotary speed |
rpm |
1.1/1.8/3.3 |
Lower pressure of sleeve |
KN |
Max.600 |
Pulling force of sleeve |
KN |
3760 Instantaneous 4300 |
Pressure-pulling stroke |
mm |
500 |
Weight |
ton |
38 |
Engine model |
|
Cummins QSM11-335 |
Engine Power |
Kw/rpm |
272/1800 |
Fuel consumption of engine |
g/kwh |
216 |
Weight |
ton |
8 |
Control mode |
|
Wired remote control/ Wireless remote control |
TR2005H | ||
Diameter of drill hole |
mm |
Φ1000-Φ2000 |
Rotary torque |
KN.m |
2965/1752/990 Instantaneous 3391 |
Rotary speed |
rpm |
1.0/1.7/2.9 |
Lower pressure of sleeve |
KN |
Max.600 |
Pulling force of sleeve |
KN |
3760 Instantaneous 4300 |
Pressure-pulling stroke |
mm |
600 |
Weight |
ton |
46 |
Engine model |
|
Cummins QSM11-335 |
Engine Power |
Kw/rpm |
272/1800 |
Fuel consumption of engine |
g/kwh |
216 |
Weight |
ton |
8 |
Control mode |
|
Wired remote control/ Wireless remote control |
TR2105H | ||
Diameter of drill hole |
mm |
Φ1000-Φ2100 |
Rotary torque |
KN.m |
3085/1823/1030 Instantaneous 3505 |
Rotary speed |
rpm |
0.9/1.5/2.7 |
Lower pressure of sleeve |
KN |
Max.600 |
Pulling force of sleeve |
KN |
3760 Instantaneous 4300 |
Pressure-pulling stroke |
mm |
500 |
Weight |
ton |
48 |
Engine model |
|
Cummins QSM11-335 |
Engine Power |
Kw/rpm |
272/1800 |
Fuel consumption of engine |
g/kwh |
216 |
Weight |
ton |
8 |
Control mode |
|
Wired remote control/ Wireless remote control |
TR2605H | ||
Diameter of drill hole |
mm |
Φ1200-Φ2600 |
Rotary torque |
KN.m |
5292/3127/1766 Instantaneous 6174 |
Rotary speed |
rpm |
0.6/1.0/1.8 |
Lower pressure of sleeve |
KN |
Max.830 |
Pulling force of sleeve |
KN |
4210 Instantaneous 4810 |
Pressure-pulling stroke |
mm |
750 |
Weight |
ton |
56 |
Engine model |
|
Cummins QSB6.7-C260 |
Engine Power |
Kw/rpm |
194/2200 |
Fuel consumption of engine |
g/kwh |
222 |
Weight |
ton |
8 |
Control mode |
|
Wired remote control/ Wireless remote control |
TR3205H | ||
Diameter of drill hole |
mm |
Φ2000-Φ3200 |
Rotary torque |
KN.m |
9080/5368/3034 Instantaneous 10593 |
Rotary speed |
rpm |
0.6/1.0/1.8 |
Lower pressure of sleeve |
KN |
Max.1100 |
Pulling force of sleeve |
KN |
7237 Instantaneous 8370 |
Pressure-pulling stroke |
mm |
750 |
Weight |
ton |
96 |
Engine model |
|
Cummins QSM11-335 |
Engine Power |
Kw/rpm |
2X272/1800 |
Fuel consumption of engine |
g/kwh |
216X2 |
Weight |
ton |
13 |
Control mode |
|
Wired remote control/ Wireless remote control |
Introduction To Construction Method
The casing rotator is a new type drill with the integration of the full hydraulic power and transmission, and the combination control of machine, power and fluid. It is a new, environmentally-friendly and highly efficient drilling technology. In recent years, it is widely adopted in the projects such as the constructions of urban subway, articulation pile of deep foundation pit enclosure, clearance of waste piles (underground obstructions ), high-speed rail, road and bridge, and urban construction piles, as well as the reinforcement of reservoir dam.
The successful research of this brand new process method has realized the possibilities for the construction workers to conduct the construction of casing pipe, displacement pile, and underground continuous wall, as well as the possibilities for the pipe-jacking and shield tunnel to pass through the various pile foundations without barriers, when the obstructions, such as the gravel and boulder formation, cave formation, thick quicksand stratum, strong necking down formation, various pile foundation and steel reinforced concrete structure, are not removed.
The construction method of casing rotator has successfully completed construction missions of more than 5000 projects at places of Singapore, Japan, Hongkong District, Shanghai, Hangzhou, Beijing and Tianjin. It certainly will play a bigger role in the future urban construction and other pile foundation construction fields.
( 1 ) Foundation pile, continuous wall
Foundation piles for high-speed rail, road and bridge and house building.
Articulation pile constructions which are required to be excavated, such as subway platforms, underground architectures, continuous walls
Water retaining wall of reservoir reinforcement.
( 2 ) Drilling gravels, boulders and karst caves
It is allowable to conduct the foundation pile construction at mountain lands with gravel and boulder formations.
It is allowable to conduct operation and cast the foundation piles at he thick quicksand formation and necking down stratum or the filling layer.
Conduct rock-socketed drilling to the rock stratum, cast the foundation pile.
( 3 ) Clear the underground obstructions
During the urban construction and bridge rebuilding, the obstructions such as the steel reinforced concrete pile, steel pipe pile, H steel pile, pc pile and wood pile can be cleared directly, and cast the foundation pile on the spot.
( 4 ) Cut the rock stratum
Conduct the rock-socketed drilling to the cast-in-place piles.
Drill through-holes on the rock bed (shafts and ventilation holes)
( 5 ) Deep excavation
Conduct the in-place casting or steel pipe pile inserting for the deep foundation improvement.
Excavate deep wells for construction use in the constructions of reservoir and tunnel.
The advantages of adopting the casing rotator for construction
1)No noise, no vibration, and high safety;
2)Without mud, clean working surface, good environmental friendliness, avoiding the possibility for mud to enter the concrete, high pile quality, enhancing the bond stress of concrete to the steel bar;
3)During construction drilling, the characteristics of stratum and rock can be directly distinguished;
4)The drilling speed is fast and reaches about 14m/h for the general soil layer;
5)The drilling depth is large and reaches about 80m according to the situation of soil layer;
6)The hole forming verticality is easy to master, which can be accurate to 1/500;
7)No hole collapse will be caused, and the hole forming quality is high.
8)The hole forming diameter is standard, with little filling factor. Being compared with other hole forming methods, it can save a lot of concrete usage;
9)The hole clearing is thorough and fast. The drilling mud at the hole bottom can be clear to about 3.0cm.
Product Picture
Product detail pictures:
Related Product Guide:
The really abundant projects administration experiences and just one to one particular provider model make the substantial importance of organization communication and our easy understanding of your expectations for OEM Customized Precast Reinforced Concrete Piles - Casing Rotator – Sinovo, The product will supply to all over the world, such as: Mali, Cape Town, Czech, Qualified R&D engineer might be there for your consultation service and we will try our best to meet your requirements. So you should feel free to contact us for inquiries. You'll be able to send us emails or call us for small business. Also you are able to come to our business by yourself to get further knowing of us. And we are going to surely present you with the best quotation and after-sale service. We're ready to build stable and friendly relations with our merchants. To achieve mutual success, we'll make our best efforts to build a solid co-operation and transparent communication work with our companions. Above all, we're here to welcome your inquiries for any of our merchandise and service.
By Isabel from Sweden - 2017.04.08 14:55
The factory has advanced equipment, experienced staffs and good management level, so product quality had assurance, this cooperation is very relaxed and happy!
By Adela from Rio de Janeiro - 2018.09.23 18:44