professional supplier of
construction machinery equipment

Short Lead Time for Concrete Piles For Deck - Casing Rotator – Sinovo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Innovation, excellent and reliability are the core values of our business. These principles today extra than ever form the basis of our success as an internationally active mid-size company for Large Bore Lathe, Tractor Boring Machine, Wall Breaker, Welcome your traveling to and any your inquires,sincerely hope we could have chance to cooperate along with you and we can build-up extensive nicely small business romantic relationship along with you.
Short Lead Time for Concrete Piles For Deck - Casing Rotator – Sinovo Detail:

Technical Parameters

 TR1305H

Working device

Diameter of drill hole

mm

Φ600-Φ1300

Rotary torque

KN.m

1400/825/466 Instantaneous 1583

Rotary speed

rpm

1.6/2.7/4.8

Lower pressure of sleeve

KN

Max.540

Pulling force of sleeve

KN

2440 Instantaneous 2690

Pressure-pulling stroke

mm

500

Weight

ton

25

Hydraulic power station

Engine model

 

Cummins QSB6.7-C260

Engine Power

Kw/rpm

201/2000

Fuel consumption of engine

g/kwh

222

Weight

ton

8

Control mode

 

Wired remote control/ Wireless remote control

TR1605H
Diameter of drill hole

mm

Φ800-Φ1600

Rotary torque

KN.m

1525/906/512 Instantaneous 1744

Rotary speed

rpm

1.3/2.2/3.9

Lower pressure of sleeve

KN

Max.560

Pulling force of sleeve

KN

2440 Instantaneous 2690

Pressure-pulling stroke

mm

500

Weight

ton

28

Engine model

 

Cummins QSB6.7-C260

Engine Power

Kw/rpm

201/2000

Fuel consumption of engine

g/kwh

222

Weight

ton

8

Control mode

 

Wired remote control/ Wireless remote control

TR1805H
Diameter of drill hole

mm

Φ1000-Φ1800

Rotary torque

KN.m

2651/1567/885 Instantaneous 3005

Rotary speed

rpm

1.1/1.8/3.3

Lower pressure of sleeve

KN

Max.600

Pulling force of sleeve

KN

3760 Instantaneous 4300

Pressure-pulling stroke

mm

500

Weight

ton

38

Engine model

 

Cummins QSM11-335

Engine Power

Kw/rpm

272/1800

Fuel consumption of engine

g/kwh

216

Weight

ton

8

Control mode

 

Wired remote control/ Wireless remote control

TR2005H
Diameter of drill hole

mm

Φ1000-Φ2000

Rotary torque

KN.m

2965/1752/990 Instantaneous 3391

Rotary speed

rpm

1.0/1.7/2.9

Lower pressure of sleeve

KN

Max.600

Pulling force of sleeve

KN

3760 Instantaneous 4300

Pressure-pulling stroke

mm

600

Weight

ton

46

Engine model

 

Cummins QSM11-335

Engine Power

Kw/rpm

272/1800

Fuel consumption of engine

g/kwh

216

Weight

ton

8

Control mode

 

Wired remote control/ Wireless remote control

TR2105H
Diameter of drill hole

mm

Φ1000-Φ2100

Rotary torque

KN.m

3085/1823/1030 Instantaneous 3505

Rotary speed

rpm

0.9/1.5/2.7

Lower pressure of sleeve

KN

Max.600

Pulling force of sleeve

KN

3760 Instantaneous 4300

Pressure-pulling stroke

mm

500

Weight

ton

48

Engine model

 

Cummins QSM11-335

Engine Power

Kw/rpm

272/1800

Fuel consumption of engine

g/kwh

216

Weight

ton

8

Control mode

 

Wired remote control/ Wireless remote control

TR2605H
Diameter of drill hole

mm

Φ1200-Φ2600

Rotary torque

KN.m

5292/3127/1766 Instantaneous 6174

Rotary speed

rpm

0.6/1.0/1.8

Lower pressure of sleeve

KN

Max.830

Pulling force of sleeve

KN

4210 Instantaneous 4810

Pressure-pulling stroke

mm

750

Weight

ton

56

Engine model

 

Cummins QSB6.7-C260

Engine Power

Kw/rpm

194/2200

Fuel consumption of engine

g/kwh

222

Weight

ton

8

Control mode

 

Wired remote control/ Wireless remote control

TR3205H
Diameter of drill hole

mm

Φ2000-Φ3200

Rotary torque

KN.m

9080/5368/3034 Instantaneous 10593

Rotary speed

rpm

0.6/1.0/1.8

Lower pressure of sleeve

KN

Max.1100

Pulling force of sleeve

KN

7237 Instantaneous 8370

Pressure-pulling stroke

mm

750

Weight

ton

96

Engine model

 

Cummins QSM11-335

Engine Power

Kw/rpm

2X272/1800

Fuel consumption of engine

g/kwh

216X2

Weight

ton

13

Control mode

 

Wired remote control/ Wireless remote control

Introduction To Construction Method

The casing rotator is a new type drill with the integration of the full hydraulic power and transmission, and the combination control of machine, power and fluid. It is a new, environmentally-friendly and highly efficient drilling technology. In recent years, it is widely adopted in the projects such as the constructions of urban subway, articulation pile of deep foundation pit enclosure, clearance of waste piles (underground obstructions ), high-speed rail, road and bridge, and urban construction piles, as well as the reinforcement of reservoir dam.
The successful research of this brand new process method has realized the possibilities for the construction workers to conduct the construction of casing pipe, displacement pile, and underground continuous wall, as well as the possibilities for the pipe-jacking and shield tunnel to pass through the various pile foundations without barriers, when the obstructions, such as the gravel and boulder formation, cave formation, thick quicksand stratum, strong necking down formation, various pile foundation and steel reinforced concrete structure, are not removed.
The construction method of casing rotator has successfully completed construction missions of more than 5000 projects at places of Singapore, Japan, Hongkong District, Shanghai, Hangzhou, Beijing and Tianjin. It certainly will play a bigger role in the future urban construction and other pile foundation construction fields.

( 1 ) Foundation pile, continuous wall
 Foundation piles for high-speed rail, road and bridge and house building.
 Articulation pile constructions which are required to be excavated, such as subway platforms, underground architectures, continuous walls
 Water retaining wall of reservoir reinforcement.
( 2 ) Drilling gravels, boulders and karst caves
 It is allowable to conduct the foundation pile construction at mountain lands with gravel and boulder formations.
 It is allowable to conduct operation and cast the foundation piles at he thick quicksand formation and necking down stratum or the filling layer.
 Conduct rock-socketed drilling to the rock stratum, cast the foundation pile.
( 3 ) Clear the underground obstructions
 During the urban construction and bridge rebuilding, the obstructions such as the steel reinforced concrete pile, steel pipe pile, H steel pile, pc pile and wood pile can be cleared directly, and cast the foundation pile on the spot.
( 4 ) Cut the rock stratum
 Conduct the rock-socketed drilling to the cast-in-place piles.
 Drill through-holes on the rock bed (shafts and ventilation holes)
( 5 ) Deep excavation
 Conduct the in-place casting or steel pipe pile inserting for the deep foundation improvement.
 Excavate deep wells for construction use in the constructions of reservoir and tunnel.

The advantages of adopting the casing rotator for construction

1)No noise, no vibration, and high safety;
2)Without mud, clean working surface, good environmental friendliness, avoiding the possibility for mud to enter the concrete, high pile quality, enhancing the bond stress of concrete to the steel bar;
3)During construction drilling, the characteristics of stratum and rock can be directly distinguished;
4)The drilling speed is fast and reaches about 14m/h for the general soil layer;
5)The drilling depth is large and reaches about 80m according to the situation of soil layer;
6)The hole forming verticality is easy to master, which can be accurate to 1/500;
7)No hole collapse will be caused, and the hole forming quality is high.
8)The hole forming diameter is standard, with little filling factor. Being compared with other hole forming methods, it can save a lot of concrete usage;
9)The hole clearing is thorough and fast. The drilling mud at the hole bottom can be clear to about 3.0cm.

Product Picture

casing rotator
Casing rotator-1
casing rotator (3)(1)
casing rotator (3)
casing rotator (1)
casing rotator (3)(1)

1.Packaging & Shipping 2.Successful Overseas Projects 3.About Sinovogroup 4.Factory Tour 5.SINOVO on Exihibition and our team 6.Certificats 7.FAQ


Product detail pictures:

Short Lead Time for Concrete Piles For Deck - Casing Rotator – Sinovo detail pictures

Short Lead Time for Concrete Piles For Deck - Casing Rotator – Sinovo detail pictures

Short Lead Time for Concrete Piles For Deck - Casing Rotator – Sinovo detail pictures

Short Lead Time for Concrete Piles For Deck - Casing Rotator – Sinovo detail pictures


Related Product Guide:

Along with the "Client-Oriented" enterprise philosophy, a rigorous high-quality control process, superior production products along with a robust R&D group, we constantly deliver premium quality products, exceptional solutions and aggressive costs for Short Lead Time for Concrete Piles For Deck - Casing Rotator – Sinovo, The product will supply to all over the world, such as: Seychelles, Zurich, Palestine, We also provide OEM service that caters to your specific needs and requirements. With a strong team of experienced engineers in hose design and development, we value every opportunity to provide best products for our customers.
  • Company director has very rich management experience and strict attitude, sales staff are warm and cheerful, technical staff are professional and responsible,so we have no worry about product,a nice manufacturer.
    5 Stars By Lisa from Borussia Dortmund - 2018.07.26 16:51
    Customer service staff and sales man are very patience and they all good at English, product's arrival is also very timely, a good supplier.
    5 Stars By Camille from Zambia - 2018.04.25 16:46