professional supplier of
construction machinery equipment

Short Lead Time for Heavy Duty Mud Pump - SHD68 horizontal directional drilling rig – Sinovo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs for Multi Boring Machine, Micro Tunnel Boring Machine, Piston Boring Machine, Quality is factory's lifestyle , Focus on customers' demand could be the source of corporation survival and advancement, We adhere to honesty and great faith operating attitude, looking ahead on your coming !
Short Lead Time for Heavy Duty Mud Pump - SHD68 horizontal directional drilling rig – Sinovo Detail:

Main Technical Parameter

Model

Unit

SHD68

Engine

 

CUMMINS

Rated power

KW

250

Max.pullback

KN

680

Max. thrusting

KN

680

Spindle torque(max)

N.m

27000

Spindle speed

r/min

0-100

Backreaming diameter

mm

1000

Tubing length (single)

m

6

Tubing diameter

mm

102

Entry angle

°

10-18

Mud pressure (max)

bar

100

Mud flow rate (max)

L/min

600

Dimension (L* W* H)

m

11*2.8*3.3

Overall weight

t

25

Performance And Characteristic

1. Pluralities of advanced control technologies are adopted, including the PLC control, electro-hydraulic proportion control, load sensitive control, etc.

2. The drilling rod automatic disassembly and assembly device can improve the working efficiency, relieves the labor intensity and manual error operation of the operators, and reduces the construction personnel and the construction cost.

3. Automatic anchor: The down and the up of the anchor is driven by hydraulic. The anchor is great in force and is easy and convenient to operate.

4. The dual-speed power head is operated with low speed when drilling and dragging back to ensure smooth construction, and can speed up to slide with 2 times of speed to reduce the auxiliary time and improve the working efficiency when returning and disassembling the drilling rod with empty loads.

5. The engine has the turbine torque increment characteristic, which can instantly increase the power to ensure the drilling power when coming across the complex geology.

Packaging & Delivery

Packaging Details
Standard exported box
Port
Tianjin
Lead Time :

Quantity(Sets) 1 – 5 >5
Est. Time(days) 5 To be negotiated

Product Picture

Horizontal directional drilling rig (29)

1.Packaging & Shipping 2.Successful Overseas Projects 3.About Sinovogroup 4.Factory Tour 5.SINOVO on Exihibition and our team 6.Certificats 7.FAQ


Product detail pictures:


Related Product Guide:

Well-run products, skilled income group, and better after-sales products and services; We have been also a unified massive family, all people stick with the business price "unification, dedication, tolerance" for Short Lead Time for Heavy Duty Mud Pump - SHD68 horizontal directional drilling rig – Sinovo, The product will supply to all over the world, such as: Marseille, Birmingham, Toronto, To let customers be more confident in us and get the most comfortable service, we run our company with honesty, sincerity and best quality . We firmly believe that it is our pleasure to help customers to run their business more successfully, and that our experienced advice and service can lead to more suitable choice for the customers.
The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
5 Stars By Marco from Saudi Arabia - 2017.09.16 13:44
We have been appreciated the Chinese manufacturing, this time also did not let us disappoint,good job!
5 Stars By Chloe from Bangkok - 2018.06.19 10:42