professional supplier of
construction machinery equipment

Short Lead Time for Hire Concrete Breaker Near Me - SPF400A Hydraulic Pile Breaker – Sinovo

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We keep on with the theory of "quality first, provider initially, constant improvement and innovation to meet the customers" with the management and "zero defect, zero complaints" as the standard objective. To great our company, we deliver the merchandise using the fantastic excellent at the reasonable price for Underground Cable Drilling Machine, Nq Hq Aq Bq, Boring Ki Machine, We warmly welcome small business companions from all walks of lifestyle, hope to establish friendly and cooperative business make contact with with you and attain a win-win objective.
Short Lead Time for Hire Concrete Breaker Near Me - SPF400A Hydraulic Pile Breaker – Sinovo Detail:

Video

SPF400-A Hydraulic Pile Breaker

Specification

Model SPF400A
Range of Pile diameter (mm) 300-400
Maximum Drill rod pressure 325kN
Maximum stroke of hydraulic cylinder 150mm
Maximum pressure of hydraulic cylinder 34.3MPa
Maximum flow of single cylinder 25L/min
Cut the number of pile/8h 160
Height for cutting pile each time ≦300mm
Supporting the digging machine Tonnage(excavator) ≧7t
Work status dimensions 1600X1600X2000mm
Total pile breaker weight 750kgs

SPF400A Construction’s Parameters

Length of drill rod Pile Diameter (mm) Remark
170 300-400 Standard Configuration
206 200-300 Optional Configuration

Product Description

DSC02262

The leading hydraulic pile breaker with five patented technologies and adjustable chain, it is the most efficient equipment to break the foundation plies. Due to the modular design the pile breaker can be used for breaking different sizes of piles. Equipped with the chains. it can work with different equipment to break piles.

Feature

The hydraulic pile breaker has the following features: easy operation, high efficiency, low cost, less noise, more safety and stability. It imposes no impact force on the parent body of the pile and no influence on the bearing capacity of the pile and no influence on the bearing capacity of the pile, and shortens the construction period greatly. It is applicable for pile-group works and is  recommended strongly by the construction department and  the supervision department.

1.Environment-friendly: Its full hydraulic drive causes little noises during operation and no influence on the surrounding environments.

2.Low-cost : The operating system is easy and convenient. Fewer operating workers are required to save cost for labor and machines maintenance during construction.

3.Multi-function: Module generalization is realized with ourSPF400A square pile machine. It can be used for both circular piles and square piles by changing the module combination.

4. Small volume: It’s light for convenient transportation.

5.Safety: Contact-free operation is enabled and it can be applied for construction on complex land form.

6.Universal property: It can be driven by diverse power sources and is compatible with excavators or hydraulic system according to the construction sites conditions. It is flexible to connect multiple construction machines with universal and economical performance. The telescopic sling lifting chains meet the requirements of various land forms.

7.Long service life: It is made of military material by first-class suppliers with reliable quality, extending its service life.

8.Convenience: it’s small for convenient transportation. Replaceable and changeable module combination makes its applicable for piles with various diameters. The modules can be assembled and disassembled easily and conveniently.

Operation steps

1. According to pile diameter, with reference to the construction reference parameters corresponding to the number of modules, directly connect the breakers to the work platform with a quick change connector;

2. The working platform can be excavator, lifting device and hydraulic pump station combination, the lifting device can be truck crane, crawler cranes, etc;

3. Move the pile breaker to the working pile head section;

4. Adjust the pile breaker to the suitable height (please refer to construction parameter list when crushing the pile, otherwise the chain may be broken), and clamp the pile position to be cut;

5. Adjust the excavator’s system pressure according to the concrete strength, and pressurize the cylinder until the concrete pile breaks under high pressure;

6. After the pile is crushed, hoist the concrete block;

7. Move the crushed pile to the designated position.

1.Packaging & Shipping 2.Successful Overseas Projects 3.About Sinovogroup 4.Factory Tour 5.SINOVO on Exihibition and our team 6.Certificats 7.FAQ


Product detail pictures:

Short Lead Time for Hire Concrete Breaker Near Me - SPF400A Hydraulic Pile Breaker – Sinovo detail pictures


Related Product Guide:

Well-run equipment, professional sales team, and better after-sales services; We are also a unified big family, everyone stick to the company value "unification, dedication, tolerance" for Short Lead Time for Hire Concrete Breaker Near Me - SPF400A Hydraulic Pile Breaker – Sinovo, The product will supply to all over the world, such as: Costa Rica, Rio de Janeiro, United Arab emirates, They are sturdy modeling and promoting effectively all over the world. Never ever disappearing major functions within a quick time, it's a have to for you of fantastic good quality. Guided by the principle of Prudence, Efficiency, Union and Innovation. the corporation. ake an excellent efforts to expand its international trade, raise its organization. rofit and raise its export scale. We are confident that we are going to have a bright prospect and to be distributed all over the world in the years to come.
  • Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
    5 Stars By Marcia from Finland - 2017.10.25 15:53
    Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
    5 Stars By Helen from Brazil - 2018.02.21 12:14