professional supplier of
construction machinery equipment

SPF500A Hydraulic Pile Breaker

Short Description:

The leading hydraulic pile breaker with five patented technologies and adjustable chain, it is the most efficient equipment to break the foundation plies. Due to the modular design the pile breaker can be used for breaking different sizes of piles. Equipped with the chains. it can work with different equipment to break piles.


Product Detail

Product Tags

Video

SPF500-A Hydraulic Pile Breaker

Specification

Model SPF500A
Range of Pile diameter (mm) 400-500
Maximum Drill rod pressure 325kN
Maximum stroke of hydraulic cylinder 150mm
Maximum pressure of hydraulic cylinder 34.3MPa
Maximum flow of single cylinder 25L/min
Cut the number of pile/8h 120
Height for cutting pile each time ≦300mm
Supporting the digging machine Tonnage(excavator) ≧12t
Work status dimensions 1710X1710X2500mm
Total pile breaker weight 960kgs

SPF500-A Construction’s Parameters

Length of drill rod Pile Diameter (mm) Remark
170 400-500 Standard Configuration
206 300-400 Optional Configuration

Product Description

The leading hydraulic pile breaker with five patented technologies and adjustable chain, it is the most efficient equipment to break the foundation plies. Due to the modular design the pile breaker can be used for breaking different sizes of piles. Equipped with the chains. it can work with different equipment to break piles.

Feature

The hydraulic pile breaker has the following features: easy operation, high efficiency, low cost, less noise, more safety and stability. It imposes no impact force on the parent body of the pile and no influence on the bearing capacity of the pile and no influence on the bearing capacity of the pile, and shortens the construction period greatly. It is applicable for pile-group works and is  recommended strongly by the construction department and  the supervision department.

1. Low-cost : The operating system is easy and convenient. Fewer operating workers are required to save cost for labor and machines maintenance during construction.

2. Environment-friendly: Its full hydraulic drive causes little noises during operation and no influence on the surrounding environments.

3. Small volume: It's light for convenient transportation. And also so convenience: it’s small for convenient transportation. Replaceable and changeable module combination makes its applicable for piles with various diameters. The modules can be assembled and disassembled easily and conveniently.

4. Multi-function: Module generalization is realized with our SPF500A square pile machine. It can be used for both circular piles and square piles by changing the module combination.

5.Safety: Contact-free operation is enabled and it can be applied for construction on complex land form.

6.Universal property: It can be driven by diverse power sources and is compatible with excavators or hydraulic system according to the construction sites conditions. It is flexible to connect multiple construction machines with universal and economical performance. The telescopic sling lifting chains meet the requirements of various land forms.

7.Long service life: It is made of military material by first-class suppliers with reliable quality, extending its service life.

Operation steps

1. According to pile diameter, with reference to the construction reference parameters corresponding to the number of modules, directly connect the breakers to the work platform with a quick change connector;

2. The working platform can be excavator, lifting device and hydraulic pump station combination, the lifting device can be truck crane, crawler cranes, etc;

3. Move the pile breaker to the working pile head section;

4. Adjust the pile breaker to the suitable height (please refer to construction parameter list when crushing the pile, otherwise the chain may be broken), and clamp the pile position to be cut;

5. Adjust the excavator's system pressure according to the concrete strength, and pressurize the cylinder until the concrete pile breaks under high pressure;

6. After the pile is crushed, hoist the concrete block;

7. Move the crushed pile to the designated position.

1.Packaging & Shipping 2.Successful Overseas Projects 3.About Sinovogroup 4.Factory Tour 5.SINOVO on Exihibition and our team 6.Certificats 7.FAQ


  • Previous:
  • Next: